Overview of Microgrid Results

Microgrid Name Generation Bus Minimum 1 hr Load (kW) Average 1 hr Load (kW) Average Daytime 1 hr Load (kW) Maximum 1 hr Load (kW) Maximum 1 hr Critical Load (kW) Existing Fossil Generation (kW) New Fossil Generation (kW) Existing Solar (kW) New Solar (kW) Existing Battery Power (kW) Existing Battery Energy Storage (kWh) New Battery Power (kW) New Battery Energy Storage (kWh) Existing Wind (kW) New Wind (kW) Total Generation on Microgrid (kW) Renewable Generation (% of Annual kWh) Emissions (Yr 1 Tons CO2) Emissions Reduction (Yr 1 % CO2) Average Outage Survived (h) O+M Costs (Yr 1 $ before tax) CapEx ($) CapEx after Tax Incentives ($) Net Present Value ($)
mg0 634 60 178 247 306 306 0 225 440 110 79 307 0 0 0 0 800 47 688 0 201 33,713 489,537 404,020 -35,691
mg1 675 243 453 574 861 713 0 487 800 592 0 0 112 247 0 0 1,991 47 1,717 0 2,812 80,246 1,954,959 1,490,375 -245,174
mg2 684 365 645 780 1,033 909 81 604 0 1,758 20 100 105 65 0 0 2,568 41 2,658 5 3,909 114,327 3,774,415 2,488,375 336,649
mg3 646 25 139 215 385 385 0 252 0 611 40 10 57 212 0 0 960 66 397 35 4,468 30,867 1,610,554 1,138,136 -29,042
Summary None 757 1,414 1,816 2,541 2,313 81 1,568 1,240 3,071 139 417 274 524 0 0 6,319 46 5,460 6 201 259,153 7,829,465 5,520,906 26,742

Report Generated

2024-02-01 02:13:10.498912

User Warnings

Supporting critical loads across microgrids assumes an AMI metering system. If not currently installed, add budget for the creation of an AMI system.
Supporting critical loads across microgrids assumes the ability to remotely disconnect 3-phase loads.
Pre-existing battery battery_684_existing will not be utilized to support loads in microgrid mg2.
Pre-existing battery battery_646_existing will not be utilized to support loads in microgrid mg3.

Distribution Upgrades needed to create Microgrids

Microgrid Location Recommended Upgrade Cost Estimate ($)
mg0 mg0 Microgrid Design 100,000
mg0 mg0 Microgrid Controls 100,000
mg0 632633 SCADA disconnect switch 50,000
mg0 634a_data_center AMI disconnect meter 300
mg0 634b_radar AMI disconnect meter 300
mg0 634c_atc_tower AMI disconnect meter 300
mg1 mg1 Microgrid Design 100,000
mg1 mg1 Microgrid Controls 100,000
mg1 671692 SCADA disconnect switch 50,000
mg1 675a_hospital 3-phase relay 20,000
mg1 675b_residential1 3-phase relay 20,000
mg1 675c_residential1 3-phase relay 20,000
mg1 692_warehouse2 3-phase relay 20,000
mg2 mg2 Microgrid Design 100,000
mg2 mg2 Microgrid Controls 100,000
mg2 671684 SCADA disconnect switch 50,000
mg2 684_command_center AMI disconnect meter 300
mg2 652_residential AMI disconnect meter 300
mg2 611_runway AMI disconnect meter 300
mg3 mg3 Microgrid Design 100,000
mg3 mg3 Microgrid Controls 100,000
mg3 632645 SCADA disconnect switch 50,000
mg3 645_hangar AMI disconnect meter 300
mg3 646_office AMI disconnect meter 300

Description